Within the framework of this project, author supervision was performed

There are four metal masts with lighting equipment for lighting the football field. They are controlled from the GS switchgear with control switches in various modes. The cables are intended to be laid at a depth of not less than 0.7m and not less than 1.0m below the carriageways and squares. Under the roads, the nets are designed to be drawn into Ø110 and Ø50 PE pipes.

 